Case Studies

Case Studies

ACD Environmental has worked for approximately 250 developers on over 800 projects in the last 12 months, through the provision of environmental consultancy services. Since the formation of the practice, the Company have successfully completed over 4,000 projects across Britain and a number of international projects.

IMG_6025
Merrow Croft
Guildford

An example of overcoming challenges in planning. ACD were instructed to provide a BS5837:2012 tree survey…

shadow
20210520_131107
Walnut Tree
Milton Keynes

The site was formerly an allocated site which was mainly laid to grass with some scrub on the site…

shadow
20170906_084547
Horndean
Hampshire

ACD has recently been working with parish councils to ensure that they meet their duty of care to users of their land…

shadow
VP6
Lunnons Farm
Barcheston

ACD Environmental Ltd undertook a range of assessments and proposals to support the introduction of poultry sheds…

shadow
20210507_131429
Wooburn Road
Ampthill

The site was the former police station and deemed brownfield allocated for residential housing on the edge…

shadow
OSMapof1931
Klondyke Field
Ipswich

Our ecologists conducted a suite of surveys to inform a proposed residential development…

shadow
Barbastelle bat
Highworth
Swindon

ACD undertook a preliminary roost inspection of a barn in Highworth, Swindon. The barn had multiple features for…

shadow
OSMapof1931
Wessex Hotel
Bournemouth

ACD prepared an impressive design in the regency area of Bournemouth. Site constraints included existing trees…

shadow
OSMapof1931
St Mary's School
Marlborough

ACD Environmental provided ecological inputs in relation to works to build a new primary school…

shadow
OSMapof1931
The Homestead
Burgess Hill

ACD completed initial desk based assessment for a site straddling the West and East Sussex border…

shadow
IMG_8539
Mast Quay
Woolwich

This location on the banks of the river Thames has multiple ecological considerations covering…

shadow
ferrers park
Ferrers Park
Lechlade

ACD was commissioned in 2015 to provide landscape architectural services for a residential development…

shadow
image-home-01-sml
Westbourne Park Road
W2

ACD worked on this project from the start and helped to secure planning consent for two semi-detached town houses…

shadow
image-home-02-sml
Coldeast Hospital
Hampshire

This large old hospital site is home to many large parkland trees and is now being developed by various companies…

shadow
image-home-03-sml
Forest Lane
Chigwell

The veteran oak tree stands proudly at the front of these two high quality houses. ACD ensured the tree protection was…

shadow
Guardians Gate
Guardians Gate
Portsmouth

The site of the former St Mary’s Hospital has been transformed into a mixed residential development on the…

shadow
image-home-04-2-sml
Pan Urban Extension
Isle of Wight

This site is an urban extension for over 800 new homes and a new Country Park, linking with the Island’s footpath network…

shadow
image-home-06-sml
Farnham
Surrey

ACD Ecology was instructed to produce a badger mitigation strategy for a development site in Farnham…

shadow
image-home-07-sml
High Wycombe
Buckinghamshire

ACD Ecology was instructed to produce a reptile mitigation strategy for a disused railway site proposed for housing…

shadow
image-home-08-2-sml
Carter’s Quay
Poole

ACD was commissioned in 2011 to provide integrated ecological, arboricultural and landscape architectural services…

shadow
image-home-09-sml
Drayton Garden Village
West Drayton

A mixture of residential, retail and open spaces, designed with a garden village concept in mind…

shadow